SMD Logo

Amazon Fulfilment Centre, Northampton

SMD Case Study Article

Case Study

Posted: 23/03/26

Amazon Fulfilment Centre, Northampton

The Amazon Fulfilment Centre Northampton is a major logistics development forming part of Amazon’s continued UK expansion. Located at SEGRO Logistics Park near Junction 15 of the M1, the scheme represents one of the most advanced distribution facilities in the region.

Design & Architectural Features.

The development is a next-generation robotics fulfilment centre, designed to maximise efficiency and throughput:

• Multi-storey structure with three to four operational levels

• Incorporates advanced robotics systems for picking and packing

• Designed to process high volumes of small-to-medium goods

• Equivalent in footprint to multiple football pitches

The Scope.

Area – Warehouse

Product - 157,000m² TR60+ floor deck

Type – Supply & Fix (Netting / Floor Deck / Shear Studs)

Year – 2025

Contract No – 10599S

SMD Logo
InstagramXLinkedInFacebookYouTube

Structural Metal Decks Limited

The Outlook, Ling Road, Poole, BH12 4PY

Registered in England & Wales No. 03560591

Tel: +44 (0) 1202 718898

SMD® 2025

Color band