
SMD Case Study Article
Case Study
Posted: 23/03/26

The Amazon Fulfilment Centre Northampton is a major logistics development forming part of Amazon’s continued UK expansion. Located at SEGRO Logistics Park near Junction 15 of the M1, the scheme represents one of the most advanced distribution facilities in the region.
The development is a next-generation robotics fulfilment centre, designed to maximise efficiency and throughput:
• Multi-storey structure with three to four operational levels
• Incorporates advanced robotics systems for picking and packing
• Designed to process high volumes of small-to-medium goods
• Equivalent in footprint to multiple football pitches
Area – Warehouse
Product - 157,000m² TR60+ floor deck
Type – Supply & Fix (Netting / Floor Deck / Shear Studs)
Year – 2025
Contract No – 10599S