SMD Case Study Article
Case Study
Posted: 23/03/26

The Kier Group-delivered Haverfordwest Public Transport Interchange (HPTI) is a major regeneration project in Pembrokeshire, Wales, designed to modernise and integrate the town’s transport infrastructure. The scheme is a key part of the wider Southwest Wales Metro initiative, aimed at improving sustainable transport links and supporting town centre regeneration.
The interchange has been designed to reflect both modern infrastructure needs and local character:
• A three-storey structure integrating transport modes
• Distinctive aluminium fins wrapping the façade
• Stone cladding at ground level referencing local heritage
• A new public square with seating and greenery
Area – Car Park
Product - 8,000m² TR80+ HD floor deck with crushed ends (installed on Pre-Welded Shear studded beams)
Type – Supply & Fix (Netting / Floor Deck / Concrete)
Year – 2026
Contract No – 10629SC