Site Installation – Stud Welding

Join our online CPD – Guidance on the installation of shear studs with metal deck!

 

Stud Welding – The installation process and ensuring you get the right quality stud welds

Tuesday 13th July 2021 @ 12:00 GMT 

Presented by Richard Brokenshire, Operations Manager 

Expected duration – 1hr

Online Platform – Microsoft Teams

 

Shear stud welding is one of the most common topics both in pre-contract meetings with our customers and from other stakeholders during the on-site installation works. There are a number of key quality considerations and logistical challenges (including the glorious British weather) that can cause delays on site if the works are not planned correctly. This presentation will cover the installation process, from preparation right through to testing, whilst touching upon some of the challenges that can be experienced. Giving you the knowledge to plan works with minimal disruption.

 

The content will cover the following:

  • Pre-start planning
  • Welding process
  • Stud spacings with SMD products
  • Good Practice – Do’s and Don’ts
  • Industry guidance referencing

Attending this presentation will provide you with a good understanding of the requirements when planning and undertaking through deck stud welding on site.

 

More events coming up!

We hold these events during lunch breaks so we don’t eat into your working day (excuse the pun) … so grab a coffee and sandwich and tune in, the presentations are open to all!  Look out for other presentations in the coming months including…..TABDeck Steel Fibre Reinforced Concrete,  Choosing the right floor product, Net/Deck installation to name a few. Connect with us on LinkedIn, Twitter or Facebook to stay up to date!

 

Request access!

Fill in your details below to register and we’ll send you details of how to access the event nearer early next week.

  • This field is for validation purposes and should be left unchanged.

Other Related Topics