
All companies should have a framework of Policies and Procedures relating to the management of Health & Safety. SMD have developed a specific Site Installation Guide to assist operatives with trade-specific guidance notes.
Contract-specific safety documentation, including Method Statements, Risk Assessments and COSHH data sheets are available for all hazards / activities associated with the handling and fixing of metal decking and associated accessories. The communication of this to the workforce, ensures that all operatives understand the risks and preventative measures that have been agreed. An initial toolbox talk on the method statement, followed by further weekly talks ensures procedures on site are appropriate to the ever-changing construction environment. Records of inductions and all toolbox talks should be maintained.
Typical hazards associated with metal decking and associated preventative measures are:
Refer to SMD Contract Specific Risk Assessments for more information.