4.10 - Steps in slab

From TGN Online
Jump to: navigation, search

Where a step in the deck/slab level is required, this should be located at supporting beam positions, with angles provided to support the lower level decking.

Depending on the difference in level and requirement for slab continuity, the higher level slab may be formed using standard edge trim (refer to Fig 4.10a) or formed traditionally by following trades (refer to Fig 4.10b).


4.10a.jpg


4.10b.jpg


Refer SMD Section Image 17a

Refer SMD Section Image 17b


When developing the detail to be used, the buildability should be considered as the detail in Fig 4.10b would require a two stage concrete pour, with the lower level poured first.