9.1 - Delivery and access

From TGN Online
Jump to: navigation, search

Decking and edge trim are delivered on 25 tonne capacity articulated vehicles with trailers up to 13.50m long. On supply and fix contracts, SMD's Contract Team will contact the client to arrange deliveries to suit minimum product lead times required for delivery of materials. Where site access restrictions apply, deliveries can be arranged on alternative vehicles (i.e. 10 tonne rigid or Hi-Ab); contact SMD's Contract Team for further advice.


9.1a.jpg


Upon arrival at site, the driver will allow a maximum two hour off-loading period, unless agreed otherwise with the SMD Operations Team. Typically, the off-loading is undertaken by the steelwork contractor in conjunction with the erection of the steel frame. SMD do not undertake off-loading of delivery vehicles.


Ground Conditions

It is essential that an assessment of ground conditions is carried out on all sites before works commence to avoid delays & significant health & safety issues.

Materials are delivered on articulated vehicles with a 25 tonnes capacity, an overall length of 16m and a gross vehicle weight of up to 49 tonnes. The vehicles are fitted with standard road suspension and tyres, suitable ground conditions are essential if delivery vehicles are to safely access site, unload & exit.

9.1b.png

A visual inspection is often adequate however, it is essential that the assessment is made by persons with relevant knowledge and experience to know when further expert advice and assessment is required.

Ground bearing capacity can also change throughout the project with weather & site conditions such as new excavations, a view of the conditions needs to be an on-going activity.

It is important to note if the ground conditions are unsuitable on our arrival to site, for Health and Safety reasons ours teams will not be able to carry out their works, which in turn could lead to additional delays and costs.