Specification

All SMD floor deck profiles offer the opportunity of utilising soffit fixings for suspending ceilings and services. Soffit fixings, also known as wedge nuts, are available to suit drop rod thread sizes of 6mm, 8mm and 10mm and can support safe working loads of up to 2.0kN (depending on the profile and drop rod size).

To avoid potential localised overloading of the slab, fixings should not be locally grouped; as a general guide, it is recommended that fixings be on a nominal minimum 600mm grid. Design advice for closer groupings should be sought from SMD Technical Team as this will depend on slab depth, profile and other design criteria for the slab.

Note: Soffit fixings are only to be installed/loaded after the concrete slab has gained specified design strength.


13.8a.jpg


13.8b.jpg


13.8c.jpg


13.8d.jpg

Refer SMD Detail Sheet SMD.DOD.174 - TR+ Soffit Service Fixing Details

Refer SMD Detail Sheet SMD.DOD.175 - R51 Service Fixing Details


Installation of Service Fixing

1. Ensure you have selected the correct wedge nut.
2. Thread wedge onto the required rod.
3. Insert wedge into the dovetail rib from below and rotate through 90 degrees so that the sloped face of the wedge bears on the decking rib.
4. The rod should then be tightened by hand up to the roof of the dovetail and a washer/locking plate set against the soffit of the decking.
5. Use mechanical tightening to finish to the torque force in the fixing manufacturers recommendations, refer to Fig. 13.8b and 13.8d.


Availability

Wedge nuts for all our floor deck products are available from Lindapter International Ltd. The wedge nut product names for our profiles are as follows:

• R51 Profile = ‘V’ Nut
• TR60+ and TR80+ = ‘TR60’ Nut


Other Options for Suspended Loads

Other fixings and proprietary anchors are also available. These should be used in accordance with fixing manufacturers guidance. The approval of such fixings should be sought from the project structural engineer. Where the load to be suspended exceeds the wedge fixing recommendation, ensure the load does not exceed the slab design capacity before considering any alternative options.


Where bolting through the slab is proposed:

• Ensure the use of non-percussive methods to minimise disturbance of the bond between deck and concrete.
• Position any bolt position through the trough section of the slab with an appropriate spreader plate size to suit the load applied.
• The exact load and position should be checked using SMD Elements® design software.