Difference between revisions of "12.3 - Cleaning the decking"
From TGN Online
(Created page with "'''Back to main Contents page''' Body - First line Body - Last line ---- Other items within 12.0 - Concrete:- : 12.1 - Site considerations : 12.2 - Tempo...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | Prior to the concrete being placed, the decking should be cleared by others of any debris, grease and/or dirt which could adversely affect the bond between the concrete and the decking. Typically, ceramic ferrules from the shear stud thru-deck welding process can be left distributed over the decking surface and lost within the concrete pour. Final clarification should be sought from the project structural engineer | |
− | + | '''Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information''' | |
− | + | ||
− | + | ||
− | + | ||
Line 11: | Line 8: | ||
− | + | Go to '''[[12.4 - Damaged decking|NEXT]]''' section | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Latest revision as of 09:57, 21 March 2017
Prior to the concrete being placed, the decking should be cleared by others of any debris, grease and/or dirt which could adversely affect the bond between the concrete and the decking. Typically, ceramic ferrules from the shear stud thru-deck welding process can be left distributed over the decking surface and lost within the concrete pour. Final clarification should be sought from the project structural engineer
Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information
Go to NEXT section