Mesh fabric, loose bar (i.e. ‘U’ bars or straight bars in troughs or over beams) and steel fibre reinforcement should be detailed by the slab designer (typically the project structural engineer). These drawings, including corresponding bar bending schedules, must be available in sufficient time to allow for procurement, delivery and installation to meet the project programme. | Mesh fabric, loose bar (i.e. ‘U’ bars or straight bars in troughs or over beams) and steel fibre reinforcement should be detailed by the slab designer (typically the project structural engineer). These drawings, including corresponding bar bending schedules, must be available in sufficient time to allow for procurement, delivery and installation to meet the project programme. | ||
Line 11: | Line 7: | ||
− | + | Go to '''[[12.7 - Concrete mix requirements|NEXT]]''' section | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Revision as of 09:58, 21 March 2017
Mesh fabric, loose bar (i.e. ‘U’ bars or straight bars in troughs or over beams) and steel fibre reinforcement should be detailed by the slab designer (typically the project structural engineer). These drawings, including corresponding bar bending schedules, must be available in sufficient time to allow for procurement, delivery and installation to meet the project programme.
Where SMD are contracted to carry out the concrete works, a reinforcement detailing service including preparation of drawings and associated bending schedules is available, contact the Concrete or Technical Team for further information.