Difference between revisions of "2.1 - Fall arrest systems"

From TGN Online
Jump to: navigation, search
Line 5: Line 5:
 
All fall arrest systems installed by SMD are supplied, tested and installed in accordance with
 
All fall arrest systems installed by SMD are supplied, tested and installed in accordance with
  
• BS EN 1263-1: 2014
+
:• BS EN 1263-1: 2014
 
+
:• BS EN 1263-2: 2014
• BS EN 1263-2: 2014
+
:• BS 8411:2007
 
+
• BS 8411:2007
+
  
 
The contract-specific method statement and risk assessment should detail the preferred method of fall arrest.
 
The contract-specific method statement and risk assessment should detail the preferred method of fall arrest.

Revision as of 10:33, 25 January 2017

Back to main Contents page


All fall arrest systems installed by SMD are supplied, tested and installed in accordance with

• BS EN 1263-1: 2014
• BS EN 1263-2: 2014
• BS 8411:2007

The contract-specific method statement and risk assessment should detail the preferred method of fall arrest.




Other items within 2.0 - Specification:-

2.1 - Fall arrest systems
2.2 - Floor deck material specification
2.3 - Stud welding
2.4 - Roof deck material specification
2.5 - Concrete