(Created page with "*Rapid speed of construction, reducing overall project time *Provides the tensile reinforcement requirements of the slab *Composite Construction reduces steelwork frame weight...")
 
Line 10: Line 10:
 
*Easily installed into complex designs, with minimal wastage
 
*Easily installed into complex designs, with minimal wastage
 
*Can achieve up to 4hr fire rating for the slab
 
*Can achieve up to 4hr fire rating for the slab
 +
 +
 +
 +
----
 +
 +
 +
Go to '''[[4.1 Construction stage and construction deflections|NEXT]]''' section

Revision as of 09:49, 14 April 2022

  • Rapid speed of construction, reducing overall project time
  • Provides the tensile reinforcement requirements of the slab
  • Composite Construction reduces steelwork frame weight
  • Reduced foundation costs, due to reduced loading
  • Integral ceiling and service fixing system
  • The decking acts as permanent shuttering
  • Provides a cover for following trades
  • When fixed, the decking provides a safe working platform
  • Minimal site storage requirements
  • Easily installed into complex designs, with minimal wastage
  • Can achieve up to 4hr fire rating for the slab