(Created page with "*Rapid speed of construction, reducing overall project time *Provides the tensile reinforcement requirements of the slab *Composite Construction reduces steelwork frame weight...") |
|||
Line 10: | Line 10: | ||
*Easily installed into complex designs, with minimal wastage | *Easily installed into complex designs, with minimal wastage | ||
*Can achieve up to 4hr fire rating for the slab | *Can achieve up to 4hr fire rating for the slab | ||
+ | |||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | Go to '''[[4.1 Construction stage and construction deflections|NEXT]]''' section |
Revision as of 09:49, 14 April 2022
- Rapid speed of construction, reducing overall project time
- Provides the tensile reinforcement requirements of the slab
- Composite Construction reduces steelwork frame weight
- Reduced foundation costs, due to reduced loading
- Integral ceiling and service fixing system
- The decking acts as permanent shuttering
- Provides a cover for following trades
- When fixed, the decking provides a safe working platform
- Minimal site storage requirements
- Easily installed into complex designs, with minimal wastage
- Can achieve up to 4hr fire rating for the slab
Go to NEXT section