Decking and edge trim are delivered on 25 tonne capacity articulated vehicles with trailers up to 13.50m long.  On supply and fix contracts, SMD Construction Manager will contact the client to arrange deliveries to suit minimum product lead times required for delivery of materials.  The seven working days stated does not include the day of call off or the day of delivery, this is purely the manufacturing duration.  Where site access restrictions apply, deliveries can be arranged on alternative vehicles (i.e. 10 tonne rigid or Hi-Ab); contact SMD Operations Team for further advice.
 
Decking and edge trim are delivered on 25 tonne capacity articulated vehicles with trailers up to 13.50m long.  On supply and fix contracts, SMD Construction Manager will contact the client to arrange deliveries to suit minimum product lead times required for delivery of materials.  The seven working days stated does not include the day of call off or the day of delivery, this is purely the manufacturing duration.  Where site access restrictions apply, deliveries can be arranged on alternative vehicles (i.e. 10 tonne rigid or Hi-Ab); contact SMD Operations Team for further advice.
  
Line 15: Line 11:
  
  
Other items within 9.0 - Supply of materials:-
+
Go to '''[[9.2 - Pack size and sheet length limits|NEXT]]''' section
: [[9.1 - Delivery and access]]
+
: [[9.2 - Pack size and sheet length limits]]
+
: [[9.3 - Offloading, hoisting and storage]]
+
: [[9.4 - Pack labels / loading-out locations]]
+

Revision as of 09:51, 21 March 2017

Decking and edge trim are delivered on 25 tonne capacity articulated vehicles with trailers up to 13.50m long. On supply and fix contracts, SMD Construction Manager will contact the client to arrange deliveries to suit minimum product lead times required for delivery of materials. The seven working days stated does not include the day of call off or the day of delivery, this is purely the manufacturing duration. Where site access restrictions apply, deliveries can be arranged on alternative vehicles (i.e. 10 tonne rigid or Hi-Ab); contact SMD Operations Team for further advice.


9.1a.jpg


Upon arrival at site, the driver will allow a maximum two hour offloading period, unless agreed otherwise with the SMD Operations Team. Typically, the offloading is undertaken by the steelwork contractor in conjunction with the erection of the steel frame. SMD do not undertake offloading of delivery vehicles.




Go to NEXT section