Difference between revisions of "MediaWiki:Sidebar"

From TGN Online
Jump to: navigation, search
Line 13: Line 13:
 
* 1.0 - Product certification
 
* 1.0 - Product certification
 
** 1.0 - Product certification|1.0-Product cert'n
 
** 1.0 - Product certification|1.0-Product cert'n
 +
 
* 2.0 - Specification
 
* 2.0 - Specification
 
** 2.1 - Fall arrest systems|2.1-Fall arrest
 
** 2.1 - Fall arrest systems|2.1-Fall arrest
Line 19: Line 20:
 
** 2.4 - Roof deck material specification|2.4-Roof deck spec'n
 
** 2.4 - Roof deck material specification|2.4-Roof deck spec'n
 
** 2.5 - Concrete|2.5-Concrete
 
** 2.5 - Concrete|2.5-Concrete
 +
 
* 3.0 - Health and Safety
 
* 3.0 - Health and Safety
 
** 3.1 - Management & supervision|3.1-Management
 
** 3.1 - Management & supervision|3.1-Management
Line 26: Line 28:
 
** 3.5 - Trained and competent workforce|3.5-Trained workforce
 
** 3.5 - Trained and competent workforce|3.5-Trained workforce
 
** 3.6 - DO's for associated trades|3.6-DO's for trades
 
** 3.6 - DO's for associated trades|3.6-DO's for trades
 +
 
* 4.0 - Design - Floor deck
 
* 4.0 - Design - Floor deck
 
** 4.1 - Benefits of composite metal deck|4.1-Benefits
 
** 4.1 - Benefits of composite metal deck|4.1-Benefits
Line 38: Line 41:
 
** 4.10 - Steps in slab|4.10-Steps in slab
 
** 4.10 - Steps in slab|4.10-Steps in slab
 
** 4.11 - End caps|4.11-End caps
 
** 4.11 - End caps|4.11-End caps
 +
 
* 5.0 - Design - Floor deck - Composite stage
 
* 5.0 - Design - Floor deck - Composite stage
** 5.0 - Design - Floor deck - Composite stage|5.0-Composite stage
+
** 5.0 - Design - Floor deck - Composite stage|5.0-Design
 
** 5.1 – Reinforcement|5.1–Reinforcement
 
** 5.1 – Reinforcement|5.1–Reinforcement
 
** 5.2 - Saw cuts|5.2-Saw cuts
 
** 5.2 - Saw cuts|5.2-Saw cuts
 
** 5.3 - Fire|5.3-Fire
 
** 5.3 - Fire|5.3-Fire
** 5.4 - Moving concentrated loads|5.4-Concentrated loads
+
** 5.4 - Moving concentrated loads|5.4-Con'd loads
 
** 5.5 - Long single span propped composite Slabs|5.5-Propped Slabs
 
** 5.5 - Long single span propped composite Slabs|5.5-Propped Slabs
 
** 5.6 - Forming service holes|5.6-Srvice holes
 
** 5.6 - Forming service holes|5.6-Srvice holes

Revision as of 11:42, 21 March 2017

  • navigation
    • mainpage|mainpage-description
    • helppage|help
  • SEARCH
  • TOOLBOX
  • LANGUAGES
    • recentchanges-url|recentchanges

//** randompage-url|randompage

  • 0.0 - Introduction
    • 0.0 - Introduction to the TGN|0.0-Introduction
  • 1.0 - Product certification
    • 1.0 - Product certification|1.0-Product cert'n
  • 2.0 - Specification
    • 2.1 - Fall arrest systems|2.1-Fall arrest
    • 2.2 - Floor deck material specification|2.2-Floor deck spec'n
    • 2.3 - Stud welding|2.3-Stud welding
    • 2.4 - Roof deck material specification|2.4-Roof deck spec'n
    • 2.5 - Concrete|2.5-Concrete
  • 3.0 - Health and Safety
    • 3.1 - Management & supervision|3.1-Management
    • 3.2 - Documentation|3.2-Documentation
    • 3.3 - Personal Protective Equipment (PPE)|3.3-PPE
    • 3.4 - Protection of falls from height|3.4-Protection of falls
    • 3.5 - Trained and competent workforce|3.5-Trained workforce
    • 3.6 - DO's for associated trades|3.6-DO's for trades
  • 4.0 - Design - Floor deck
    • 4.1 - Benefits of composite metal deck|4.1-Benefits
    • 4.2 - Sheet lengths|4.2-Sheet lengths
    • 4.3 - Temporary propping|4.3-Temp' propping
    • 4.4 - Lateral restraint and diaphragm action|4.4-Lat restraint & diaphragm action
    • 4.5 - Bearings / Support|4.5-Bearing/Support
    • 4.6 - Fixings|4.6-Fixings
    • 4.7 - Cantilevers|4.7-Cantilevers
    • 4.8 - Edge trim|4.8-Edge trim
    • 4.9 - Flashings|4.9-Flashings
    • 4.10 - Steps in slab|4.10-Steps in slab
    • 4.11 - End caps|4.11-End caps
  • 5.0 - Design - Floor deck - Composite stage
    • 5.0 - Design - Floor deck - Composite stage|5.0-Design
    • 5.1 – Reinforcement|5.1–Reinforcement
    • 5.2 - Saw cuts|5.2-Saw cuts
    • 5.3 - Fire|5.3-Fire
    • 5.4 - Moving concentrated loads|5.4-Con'd loads
    • 5.5 - Long single span propped composite Slabs|5.5-Propped Slabs
    • 5.6 - Forming service holes|5.6-Srvice holes