Difference between revisions of "MediaWiki:Sidebar"

From TGN Online
Jump to: navigation, search
m (2.0 fix)
 
(26 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
* navigation
 
* navigation
 +
** Special:Login|Login
 
** mainpage|mainpage-description
 
** mainpage|mainpage-description
 +
//** MediaWiki:Sidebar|MediaWiki:Sidebar
 
** helppage|help
 
** helppage|help
 
* SEARCH
 
* SEARCH
* TOOLBOX
+
//** TOOLBOX
 
* LANGUAGES
 
* LANGUAGES
** recentchanges-url|recentchanges
+
//** recentchanges-url|recentchanges
 
//** randompage-url|randompage
 
//** randompage-url|randompage
  
 
+
* TGN Contents
 
+
** Contents|Main Contents
* 0.0 - Introduction
+
** 0.0 - Introduction to the TGN|0.0 - Introduction  
** 0.0 - Introduction to the TGN|0.0-Introduction
+
** 1.0 - Product certification|1.0 - Certification
* 1.0 - Product certification
+
** 2.0 - Specification|2.0 - Specification
** 1.0 - Product certification|1.0-Product cert'n
+
** 3.1 - Management & supervision|3.0 - H&S
 
+
** 4.0 Design, Floor deck|4.0 - Design, Floor deck
* 2.0 - Specification
+
** 5.0 - Design - Floor deck - Composite stage|5.0 - Composite stage
** 2.1 - Fall arrest systems|2.1-Fall arrest
+
** 6.0 - Design - Floor deck composite beam design|6.0 - Comp' Design
** 2.2 - Floor deck material specification|2.2-Floor deck spec'n
+
** 7.1 - Falls and ramps|7.0 - Floor Cons'ns
** 2.3 - Stud welding|2.3-Stud welding
+
** 8.0 - Design - Roof deck|8.0 - Design, Roof
** 2.4 - Roof deck material specification|2.4-Roof deck spec'n
+
** 9.1 - Delivery and access|9.0 - Supply materials
** 2.5 - Concrete|2.5-Concrete
+
** 10.0 - Installation - Fall arrest systems|10.0 - Fall arrest
 
+
** 11.0 - Installation - Floor deck and shear studs|11.0 - Floor/stud Inst'n
* 3.0 - Health and Safety
+
** 12.1 - Site considerations|12.0 - Concrete
** 3.1 - Management & supervision|3.1-Management
+
** 13.1 - High Durability floor deck|13.0 - SMD Options
** 3.2 - Documentation|3.2-Documentation
+
** 14.1 - SMD documentation|14.0 - References
** 3.3 - Personal Protective Equipment (PPE)|3.3-PPE
+
** 3.4 - Protection of falls from height|3.4-Protection of falls
+
** 3.5 - Trained and competent workforce|3.5-Trained workforce
+
** 3.6 - DO's for associated trades|3.6-DO's for trades
+
 
+
* 4.0 - Design - Floor deck
+
** 4.1 - Benefits of composite metal deck|4.1-Benefits
+
** 4.2 - Sheet lengths|4.2-Sheet lengths
+
** 4.3 - Temporary propping|4.3-Temp' propping
+
** 4.4 - Lateral restraint and diaphragm action|4.4-Lat restraint & diaphragm action
+
** 4.5 - Bearings / Support|4.5-Bearing/Support
+
** 4.6 - Fixings|4.6-Fixings
+
** 4.7 - Cantilevers|4.7-Cantilevers
+
** 4.8 - Edge trim|4.8-Edge trim
+
** 4.9 - Flashings|4.9-Flashings
+
** 4.10 - Steps in slab|4.10-Steps in slab
+
** 4.11 - End caps|4.11-End caps
+
 
+
* 5.0 - Floor deck, Composite stage design
+
** 5.0 - Design - Floor deck - Composite stage|5.0-Design
+
** 5.1 – Reinforcement|5.1–Reinforcement
+
** 5.2 - Saw cuts|5.2-Saw cuts
+
** 5.3 - Fire|5.3-Fire
+
** 5.4 - Moving concentrated loads|5.4-Con'd loads
+
** 5.5 - Long single span propped composite Slabs|5.5-Propped Slabs
+
** 5.6 - Forming service holes|5.6-Srvice holes
+
 
+
* 6.0 - Floor deck, Composite beam design
+
** 6.0 - Design - Floor deck composite beam design|6.0-Composite beam design
+
** 6.1 - Shear stud LAW (length after weld)|6.1-Shear stud LAW
+
** 6.2 - Design rules for minimum degree of connection|6.2-Design rules
+
** 6.3 - Shear stud reduction factors|6.3-Stud red'n factors
+
** 6.4 - BS EN 1994-1-1 Reduction factors for SMD Products|6.4-BS EN 1994-1-1
+
** 6.5 - BS5950-3 Section 3.1 Reduction factors for SMD Products|6.5-BS5950-3
+
** 6.6 - Shear stud spacing|6.6-Stud spacing
+
** 6.7 -Transverse reinforcement for composite beams|6.7-Trans' reinf't
+
** 6.8 - Alternative Shear Connectors|6.8-Alt' Shear Con'trs
+

Latest revision as of 13:51, 3 November 2023

  • navigation
    • Special:Login|Login
    • mainpage|mainpage-description

//** MediaWiki:Sidebar|MediaWiki:Sidebar

    • helppage|help
  • SEARCH

//** TOOLBOX

  • LANGUAGES

//** recentchanges-url|recentchanges //** randompage-url|randompage

  • TGN Contents
    • Contents|Main Contents
    • 0.0 - Introduction to the TGN|0.0 - Introduction
    • 1.0 - Product certification|1.0 - Certification
    • 2.0 - Specification|2.0 - Specification
    • 3.1 - Management & supervision|3.0 - H&S
    • 4.0 Design, Floor deck|4.0 - Design, Floor deck
    • 5.0 - Design - Floor deck - Composite stage|5.0 - Composite stage
    • 6.0 - Design - Floor deck composite beam design|6.0 - Comp' Design
    • 7.1 - Falls and ramps|7.0 - Floor Cons'ns
    • 8.0 - Design - Roof deck|8.0 - Design, Roof
    • 9.1 - Delivery and access|9.0 - Supply materials
    • 10.0 - Installation - Fall arrest systems|10.0 - Fall arrest
    • 11.0 - Installation - Floor deck and shear studs|11.0 - Floor/stud Inst'n
    • 12.1 - Site considerations|12.0 - Concrete
    • 13.1 - High Durability floor deck|13.0 - SMD Options
    • 14.1 - SMD documentation|14.0 - References