Difference between revisions of "11.9 Void Protection"

From TGN Online
Jump to: navigation, search
 
Line 30: Line 30:
  
 
'''Ensure good Heath and Safety is maintained''' - Ensure that edge protection is inspected, complete and secure on completion, before use and at 7 days intervals.
 
'''Ensure good Heath and Safety is maintained''' - Ensure that edge protection is inspected, complete and secure on completion, before use and at 7 days intervals.
 
  
  
Line 36: Line 35:
  
  
Back to '''[[Contents]]''' Page
+
Go to '''[[11.10 VoidSafe® Protection System|NEXT]]''' section
 
+
 
+
 
+
= '''Need Further Guidance?''' =
+
 
+
Contact us on +44 (0)1202 718 898 or email our [mailto:technical@smdltd.co.uk?Subject=Technical%20Info%20Query(online)&body=%20 Technical Team]
+

Latest revision as of 13:11, 13 April 2022

Void protection must be positioned to all internal voids to prevent falls from height. Where applicable, Edge Protection must be in place prior to the decking Installation commencing. Should handrails not be present, various methods can be used to eliminate the hazard of open voids.


Handrails - Most common, larger voids must have hand rails installed either prior to the decking or before the nets are dropped.

11.9a-low.jpg


VoidSafe® Protection System - An SMD product option for small voids. Can significantly improve site logistics and access throughout the floor area, eliminating the use of handrails and additional trades, reduces program times and additional trade costs.

Click here for more information https://smdltd.co.uk/products-services/voidsafe-protection-system/

11.9b-low.jpg


Timber covers - Small voids may be boarded out following the installation of deck and trim but before the removal of safety netting.

11.9c-low.jpg


Deck over small voids and openings - Prevents operatives, sparks, materials and fixings from falling and reduces requirement for edge protection. Box out during concrete placement and cut out later.

11.9d-low.jpg


Scaffold and boards for finger beams - Finger Beams require careful consideration to ensure that safe access & fall protection is provided. The use of under slung scaffold crash decks is the best option as it provides collective, passive protection to all trades.

11.9e-low.jpg


Ensure good Heath and Safety is maintained - Ensure that edge protection is inspected, complete and secure on completion, before use and at 7 days intervals.




Go to NEXT section