Difference between revisions of "12.1 - Site considerations"

From TGN Online
Jump to: navigation, search
(Created page with "'''Back to main Contents page''' Body - First line   Body - Last line ---- Other items within 12.0 - Concrete:- : 12.1 - Site considerations : 12.2 - Tempo...")
(No difference)

Revision as of 13:53, 25 January 2017

Back to main Contents page


Body - First line  

Body - Last line




Other items within 12.0 - Concrete:-

12.1 - Site considerations
12.2 - Temporary propping
12.3 - Cleaning the decking
12.4 - Damaged decking
12.5 - Construction joints
12.6 - Reinforcement drawings and bending schedules
12.7 - Concrete mix requirements
12.8 - Placement
12.9 - Surface finish
12.10 - Surface flatness
12.11 - Curing
12.12 - Post-installation characteristics