Difference between revisions of "12.3 - Cleaning the decking"
From TGN Online
Line 7: | Line 7: | ||
'''Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information''' | '''Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information''' | ||
+ | |||
---- | ---- |
Revision as of 14:54, 25 January 2017
Back to main Contents page
Prior to the concrete being placed, the decking should be cleared by others of any debris, grease and/or dirt which could adversely affect the bond between the concrete and the decking. Typically, ceramic ferrules from the shear stud thru-deck welding process can be left distributed over the decking surface and lost within the concrete pour. Final clarification should be sought from the project structural engineer
Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information
Other items within 12.0 - Concrete:-
- 12.1 - Site considerations
- 12.2 - Temporary propping
- 12.3 - Cleaning the decking
- 12.4 - Damaged decking
- 12.5 - Construction joints
- 12.6 - Reinforcement drawings and bending schedules
- 12.7 - Concrete mix requirements
- 12.8 - Placement
- 12.9 - Surface finish
- 12.10 - Surface flatness
- 12.11 - Curing
- 12.12 - Post-installation characteristics