12.3 - Cleaning the decking

From TGN Online
Revision as of 14:54, 25 January 2017 by Admin (Talk | contribs)

Jump to: navigation, search

Back to main Contents page


Prior to the concrete being placed, the decking should be cleared by others of any debris, grease and/or dirt which could adversely affect the bond between the concrete and the decking. Typically, ceramic ferrules from the shear stud thru-deck welding process can be left distributed over the decking surface and lost within the concrete pour. Final clarification should be sought from the project structural engineer


Refer to Nelson Stud Welding – Application Information: Removal of Broken Ferrules - WTD (31/01/2006) for more information



Other items within 12.0 - Concrete:-

12.1 - Site considerations
12.2 - Temporary propping
12.3 - Cleaning the decking
12.4 - Damaged decking
12.5 - Construction joints
12.6 - Reinforcement drawings and bending schedules
12.7 - Concrete mix requirements
12.8 - Placement
12.9 - Surface finish
12.10 - Surface flatness
12.11 - Curing
12.12 - Post-installation characteristics