*;Land packs on the frame in the correct position
 +
:It is essential that the decking packs are loaded out in the position indicated on SMD’s decking layout drawings to minimise the manual handling risk!
  
  
 +
*;Fix all sheets before leaving area
 +
:Unfixed decking sheets pose a danger to others on site, ensure that as areas are being laid that they are not left unattended until fixed.  At the end of each shift, any unfixed sheets in decking packs must be secured down.
  
'''Land packs on the frame in the correct position'''
 
  
It is essential that the decking packs are loaded out in the position indicated on SMD’s decking layout drawings to minimise the manual handling risk!
+
*;Ensure heavy loads are placed over supports
 +
:Other trades must be made aware of the storage capacity of decking prior to concrete and the appropriate procedures for locating heavy loads on timbers laid above the structural support lines.
  
  
'''Fix all sheets before leaving area'''
+
*;Avoid cutting holes in the deck before concreting
 +
:If additional holes are required to be cut into the decking before concreting, contact SMD Technical Team for guidance.
  
Unfixed decking sheets pose a danger to others on site, ensure that as areas are being laid that they are not left unattended until fixed.  At the end of each shift, any unfixed sheets in decking packs must be secured down.
 
  
 +
*;Follow concrete good practice
 +
:Following concrete trades must be aware of best practice when pouring on upper floor decks, to ensure overloading is avoided and any propping requirements are in place.
  
'''Ensure heavy loads are placed over supports'''
 
  
Other trades must be made aware of the storage capacity of decking prior to concrete and the appropriate procedures for locating heavy loads on timbers laid above the structural support lines.
+
*;Check design implications before cutting any sheets to single span
 
+
:Where sheets have been designed and supplied as double-spanning, they must not be cut to single span without checking the safe un-propped single span for the product involved.  Cutting a sheet may introduce the need for propping!  
 
+
'''Avoid cutting holes in the deck before concreting'''
+
 
+
If additional holes are required to be cut into the decking before concreting, contact SMD Technical Team for guidance.
+
 
+
 
+
'''Follow concrete good practice'''
+
 
+
Following concrete trades must be aware of best practice when pouring on upper floor decks, to ensure overloading is avoided and any propping requirements are in place.
+
 
+
 
+
'''Check design implications before cutting any sheets to single span'''
+
 
+
Where sheets have been designed and supplied as double-spanning, they must not be cut to single span without checking the safe un-propped single span for the product involved.  Cutting a sheet may introduce the need for propping!  
+
  
  
Line 39: Line 29:
  
  
'''Other items within 3.0 - Health and Safety:-'''
+
Back to '''[[Contents]]''' Page
 
+
'''https://smdltd.co.uk/technical-info/3.1_-_Management_%26_supervision 3.1 - Management & supervision]'''
+
 
+
'''[https://smdltd.co.uk/technical-info/3.2_-_Documentation 3.2 - Documentation]'''
+
  
'''[https://smdltd.co.uk/technical-info/3.3_-_Personal_Protective_Equipment_(PPE) 3.3 - Personal Protective Equipment (PPE)]'''
 
  
'''[https://smdltd.co.uk/technical-info/3.4_-_Protection_of_falls_from_height 3.4 - Protection of falls from height]'''
 
  
'''[https://smdltd.co.uk/technical-info/3.5_-_Trained_and_competent_workforce 3.5 - Trained and competent workforce]'''
+
= '''Need Further Guidance?''' =
  
''[https://smdltd.co.uk/technical-info/3.6_-_DO%27s_for_associated_trades 3.6 - DO's for associated trades]''
+
Contact us on +44 (0)1202 718 898 or email our [mailto:technical@smdltd.co.uk?Subject=Technical%20Info%20Query(online)&body=%20 Technical Team]

Latest revision as of 12:51, 21 March 2017

  • Land packs on the frame in the correct position
It is essential that the decking packs are loaded out in the position indicated on SMD’s decking layout drawings to minimise the manual handling risk!


  • Fix all sheets before leaving area
Unfixed decking sheets pose a danger to others on site, ensure that as areas are being laid that they are not left unattended until fixed. At the end of each shift, any unfixed sheets in decking packs must be secured down.


  • Ensure heavy loads are placed over supports
Other trades must be made aware of the storage capacity of decking prior to concrete and the appropriate procedures for locating heavy loads on timbers laid above the structural support lines.


  • Avoid cutting holes in the deck before concreting
If additional holes are required to be cut into the decking before concreting, contact SMD Technical Team for guidance.


  • Follow concrete good practice
Following concrete trades must be aware of best practice when pouring on upper floor decks, to ensure overloading is avoided and any propping requirements are in place.


  • Check design implications before cutting any sheets to single span
Where sheets have been designed and supplied as double-spanning, they must not be cut to single span without checking the safe un-propped single span for the product involved. Cutting a sheet may introduce the need for propping!


Contact SMD Technical Team or use SMD Elements ® Software for guidance.