When designing pre-studded beams, there are a few rules to follow to ensure the studs are installed correctly and do not hinder the installation of the floor deck profiles.  
 
When designing pre-studded beams, there are a few rules to follow to ensure the studs are installed correctly and do not hinder the installation of the floor deck profiles.  
 +
  
 
'''Consideration'''
 
'''Consideration'''

Revision as of 14:32, 19 April 2022

On-site stud welding is the primary choice when installing shear studs to beams as the studs can be thru-deck welded to beams (once the deck is in-situ). Where it is not possible to site-weld shear studs, pre-studded beams are one solution to overcome this issue. A few reasons why site welding cannot take place can be due to:

  • Installation required above public walkways or live public areas
  • Installation required above swimming pools
  • Installation required to internal, poorly vented areas
  • Studs required to areas which are difficult to access

When designing pre-studded beams, there are a few rules to follow to ensure the studs are installed correctly and do not hinder the installation of the floor deck profiles.


Consideration

A key design and installation consideration to be aware of, all shear studs to be placed along the centre line of the beam allowing sufficient bearing for the floor deck to be fixed on the beam flange. It is suggested that a gap of 10mm maintained around the side of the stud to allow for the weld between the stud and the beam, as well as installation tolerances (giving slight movement for the deck sheets to be moved into place).


Tolerances and movement gaps

Due to this, it is suggested that the following beam sizes should be used based on the following stud requirements (using 19mm diameter studs):-

  • 1 Row of studs = 140mm top flange
  • 2 rows of studs (Pairs) = 229mm top flange

\