Difference between revisions of "Contents"

From TGN Online
Jump to: navigation, search
m (Formatting)
Line 36: Line 36:
  
 
== 4.0 - Design - Floor deck ==
 
== 4.0 - Design - Floor deck ==
==== [https://smdltd.co.uk/technical-info/4.1_-_Benefits_of_composite_metal_deck 4.1 - Benefits of composite metal deck] ====
+
[[6.0 - Design - Floor deck composite beam design]]
==== [https://smdltd.co.uk/technical-info/4.2_-_Sheet_lengths 4.2 - Sheet lengths] ====
+
[[6.1 - Shear stud LAW (length after weld)]]
==== [https://smdltd.co.uk/technical-info/4.3_-_Temporary_propping 4.3 - Temporary propping] ====
+
[[6.2 - Design rules for minimum degree of connection]]
==== [https://smdltd.co.uk/technical-info/4.4_-_Lateral_restraint_and_diaphragm_action 4.4 - Lateral restraint and diaphragm action] ====
+
[[6.3 - Shear stud reduction factors]]
==== [https://smdltd.co.uk/technical-info/4.5_-_Bearings_/_Support 4.5 - Bearings / Support] ====
+
[[6.4 - BS EN 1994-1-1 Reduction factors for SMD Products]]
==== [https://smdltd.co.uk/technical-info/4.6_-_Fixings 4.6 - Fixings] ====
+
[[6.5 - BS5950-3 Section 3.1 Reduction factors for SMD Products]]
==== [https://smdltd.co.uk/technical-info/4.7_-_Cantilevers 4.7 - Cantilevers] ====
+
[[6.6 - Shear stud spacing]]
==== [https://smdltd.co.uk/technical-info/4.8_-_Edge_trim 4.8 - Edge trim] ====
+
[[6.7 -Transverse reinforcement for composite beams]]
==== [https://smdltd.co.uk/technical-info/4.9_-_Flashings 4.9 - Flashings] ====
+
[[6.8 - Alternative Shear Connectors]]
==== [https://smdltd.co.uk/technical-info/4.10_-_Steps_in_slab 4.10 - Steps in slab] ====
+
==== [https://smdltd.co.uk/technical-info/4.11_-_End_caps 4.11 - End caps] ====
+
  
 
----  
 
----  

Revision as of 09:18, 25 January 2017

All contents of the Technical Guidance Notes (TGN) are listed under the following main sections:-


0.0 - Introduction to the TGN

0.0 - Help us to help you!

0.0 - References

1.0 - Product certification

1.0 - Legal requirements

2.0 - Specification

2.1 - Fall arrest systems

2.2 - Floor deck material specification

2.3 - Stud welding

2.4 - Roof deck material specification

2.5 - Concrete

3.0 - Health and Safety

3.1 - Management & supervision

3.2 - Documentation

3.3 - Personal Protective Equipment (PPE)

3.4 - Protection of falls from height

3.5 - Trained and competent workforce

3.6 - DO's for associated trades

4.0 - Design - Floor deck

6.0 - Design - Floor deck composite beam design 6.1 - Shear stud LAW (length after weld) 6.2 - Design rules for minimum degree of connection 6.3 - Shear stud reduction factors 6.4 - BS EN 1994-1-1 Reduction factors for SMD Products 6.5 - BS5950-3 Section 3.1 Reduction factors for SMD Products 6.6 - Shear stud spacing 6.7 -Transverse reinforcement for composite beams 6.8 - Alternative Shear Connectors


5.0 - Design - Floor deck - Composite stage
5.1 – Reinforcement
5.2 - Saw cuts
5.3 - Fire
5.4 - Moving concentrated loads
5.5 - Long single span propped composite Slabs
5.6 - Forming service holes


6.0 - Design - Floor deck, composite beam design


7.0 - Design - Floor deck, considerations


8.0 - Design - Roof deck


9.0 - Supply of materials


10.0 - Installation, Fall arrest systems


11.0 - Installation, Floor deck and shear studs


12.0 - Concrete


13.0 - Product Options


14.0 - References




Need more information?

For more information on any of the sections in on this site, contact us on +44 (0) 1202 718 898 or email our Technical Team