Difference between revisions of "4.9 - Flashings"

From TGN Online
Jump to: navigation, search
Line 1: Line 1:
[https://smdltd.co.uk/technical-info/Contents '''Back to main Contents page''']
+
'''Back to main [[Contents]] page'''
  
  
Line 19: Line 19:
  
  
'''Other items within 4.0 - Design - Floor deck:-'''
+
Other items within 4.0 - Design - Floor deck:-
 
+
: [[4.1 - Benefits of composite metal deck]]
'''[https://smdltd.co.uk/technical-info/4.1_-_Benefits_of_composite_metal_deck 4.1 - Benefits of composite metal deck]'''
+
: [[4.2 - Sheet lengths]]
 
+
: [[4.3 - Temporary propping]]
'''[https://smdltd.co.uk/technical-info/4.2_-_Sheet_lengths 4.2 - Sheet lengths]'''
+
: [[4.4 - Lateral restraint and diaphragm action]]
 
+
: [[4.5 - Bearings / Support]]
'''[https://smdltd.co.uk/technical-info/4.3_-_Temporary_propping 4.3 - Temporary propping]'''
+
: [[4.6 - Fixings]]
 
+
: [[4.7 - Cantilevers]]
'''[https://smdltd.co.uk/technical-info/4.4_-_Lateral_restraint_and_diaphragm_action 4.4 - Lateral restraint and diaphragm action]'''
+
: [[4.8 - Edge trim]]
 
+
: [[4.9 - Flashings]]
'''[https://smdltd.co.uk/technical-info/4.5_-_Bearings_/_Support 4.5 - Bearings / Support]'''
+
: [[4.10 - Steps in slab]]
 
+
: [[4.11 - End caps]]
'''[https://smdltd.co.uk/technical-info/4.6_-_Fixings 4.6 - Fixings]'''
+
 
+
'''[https://smdltd.co.uk/technical-info/4.7_-_Cantilevers 4.7 - Cantilevers]'''
+
 
+
'''[https://smdltd.co.uk/technical-info/4.8_-_Edge_trim 4.8 - Edge trim]'''
+
 
+
''[https://smdltd.co.uk/technical-info/4.9_-_Flashings 4.9 - Flashings]''
+
 
+
'''[https://smdltd.co.uk/technical-info/4.10_-_Steps_in_slab 4.10 - Steps in slab]'''
+
 
+
'''[https://smdltd.co.uk/technical-info/4.11_-_End_caps 4.11 - End caps]'''
+

Revision as of 09:35, 25 January 2017

Back to main Contents page


Where perimeter beams, or intermediate beams that are to receive shear studs, run parallel to the deck span and the deck width either falls short or is positioned such that a trough is not located over the beam flange, galvanised mild steel flashings should be provided to form a closure to the profile (refer to Fig 4.9b). Flashings are available in 1.0mm, 1.2mm, 1.6mm and 2.0mm gauges; supplied to site in standard 3m lengths. The exact geometry and requirement for these flashings will be detailed on SMD decking layout drawings where provided.


4.9b.jpg

Refer to SMD Data sheet SMD.DOD.172 - TR+ profile slab edge and flashings

Refer to SMD Data sheet SMD.DOD.173 - R51 slab edge and flashings





Other items within 4.0 - Design - Floor deck:-

4.1 - Benefits of composite metal deck
4.2 - Sheet lengths
4.3 - Temporary propping
4.4 - Lateral restraint and diaphragm action
4.5 - Bearings / Support
4.6 - Fixings
4.7 - Cantilevers
4.8 - Edge trim
4.9 - Flashings
4.10 - Steps in slab
4.11 - End caps