Uncategorized pages

Jump to: navigation, search

Showing below up to 50 results in range #51 to #100.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. 3.1 - Management & supervision
  2. 3.2 - Documentation
  3. 3.3 - Personal Protective Equipment (PPE)
  4. 3.4 - Protection of falls from height
  5. 3.5 - Trained and competent workforce
  6. 3.6 - DO's for associated trades
  7. 4.0 Design, Floor deck
  8. 4.10 - Steps in slab
  9. 4.11 - End caps
  10. 4.1 - Benefits of composite metal deck
  11. 4.1 Construction stage and construction deflections
  12. 4.2 - Sheet lengths
  13. 4.3 - Temporary propping
  14. 4.4 - Lateral restraint and diaphragm action
  15. 4.5 - Bearings / Support
  16. 4.6 - Fixings
  17. 4.7 - Cantilevers
  18. 4.8 - Edge trim
  19. 4.9 - Flashings
  20. 5.0 - Design - Floor deck - Composite stage
  21. 5.1 - Reinforcement
  22. 5.2 - Saw cuts
  23. 5.3 - Fire
  24. 5.4 - Moving concentrated loads
  25. 5.5 - Long single span propped composite Slabs
  26. 5.6 - Forming service holes
  27. 6.0 - Design - Floor deck composite beam design
  28. 6.1 - Shear stud LAW (length after weld)
  29. 6.2 - Design rules for minimum degree of connection
  30. 6.3 - Shear stud reduction factors
  31. 6.4 - BS EN 1994-1-1 Reduction factors for SMD Products
  32. 6.5 - BS5950-3 Section 3.1 Reduction factors for SMD Products
  33. 6.6 - Shear stud spacing
  34. 6.7 -Transverse reinforcement for composite beams
  35. 6.8 - Alternative Shear Connectors
  36. 6.9 Pre-studded beams
  37. 7.1 - Falls and ramps
  38. 7.2 - Fixing tool and stud welding gun restrictions
  39. 7.3 - Concrete encased beams
  40. 7.4 - Durability
  41. 7.5 - Aggressive environments
  42. 7.6 - Vibration
  43. 7.7 - Acoustics
  44. 7.8 - Thermal mass
  45. 8.0 - Design - Roof deck
  46. 8.10 - Durability
  47. 8.11 - Acoustics
  48. 8.12 - Airtightness
  49. 8.13 - Fixing specification
  50. 8.14 - Flashing details

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)