Oldest pages
Showing below up to 123 results in range #1 to #123.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- 3.1 - Management & supervision (09:18, 21 March 2017)
- 3.4 - Protection of falls from height (09:19, 21 March 2017)
- 3.5 - Trained and competent workforce (09:20, 21 March 2017)
- 6.0 - Design - Floor deck composite beam design (09:35, 21 March 2017)
- 6.2 - Design rules for minimum degree of connection (09:36, 21 March 2017)
- 6.3 - Shear stud reduction factors (09:37, 21 March 2017)
- 7.6 - Vibration (09:42, 21 March 2017)
- 7.7 - Acoustics (09:42, 21 March 2017)
- 8.9 - Fire rating (09:47, 21 March 2017)
- 8.16 - Protex® warranted insulated system (09:50, 21 March 2017)
- 11.4 - Mobile stud welding equipment (09:55, 21 March 2017)
- 12.3 - Cleaning the decking (09:57, 21 March 2017)
- 12.4 - Damaged decking (09:58, 21 March 2017)
- 2.5 - Concrete (12:51, 21 March 2017)
- 3.6 - DO's for associated trades (12:51, 21 March 2017)
- 3.3 - Personal Protective Equipment (PPE) (11:12, 22 March 2017)
- 4.10 - Steps in slab (11:16, 22 March 2017)
- 5.0 - Design - Floor deck - Composite stage (11:16, 22 March 2017)
- 5.5 - Long single span propped composite Slabs (11:17, 22 March 2017)
- 7.1 - Falls and ramps (11:18, 22 March 2017)
- 8.2 - Spans (11:21, 22 March 2017)
- 12.2 - Temporary propping (11:24, 22 March 2017)
- 12.11 - Curing (11:25, 22 March 2017)
- 13.4 - Perimeter toeboard (11:29, 22 March 2017)
- 13.5 - Channel edge trim (11:29, 22 March 2017)
- 2.1 - Fall arrest systems (12:47, 27 March 2017)
- 8.12 - Airtightness (14:37, 27 March 2017)
- 8.8 - Sheet lengths (08:01, 28 September 2017)
- 8.7 - Cantilevers (10:16, 11 December 2017)
- 12.5 - Construction joints (12:01, 10 May 2018)
- 4.11 - End caps (14:37, 14 August 2018)
- 6.5 - BS5950-3 Section 3.1 Reduction factors for SMD Products (14:51, 14 August 2018)
- 7.3 - Concrete encased beams (15:22, 14 August 2018)
- 7.8 - Thermal mass (15:28, 14 August 2018)
- 8.0 - Design - Roof deck (15:30, 14 August 2018)
- 8.3 - Loads (15:35, 14 August 2018)
- 8.4 - Standard end laps (15:38, 14 August 2018)
- 8.6 - Raking supports and cutting (15:39, 14 August 2018)
- 8.10 - Durability (15:40, 14 August 2018)
- 8.11 - Acoustics (15:41, 14 August 2018)
- 8.16 - Diaphragm design (16:03, 14 August 2018)
- 8.15 - Non-fragility (16:04, 14 August 2018)
- 8.14 - Non-fragility (16:07, 14 August 2018)
- 8.15 - Diaphragm design (16:07, 14 August 2018)
- 8.17 - Aesthetics (16:08, 14 August 2018)
- 8.14 - Flashing details (16:15, 14 August 2018)
- 10.0 - Installation - Fall arrest systems (08:57, 15 August 2018)
- 11.1 - Cartridge tools (08:57, 15 August 2018)
- 13.1 - High Durability floor deck (09:01, 15 August 2018)
- 6.4 - BS EN 1994-1-1 Reduction factors for SMD Products (15:19, 16 August 2018)
- 13.9 - Plastisol (PF) Coating (14:54, 22 October 2019)
- 5.1 - Reinforcement (15:19, 30 October 2020)
- 8.13 - Fixing specification (09:44, 16 December 2020)
- 13.2 - Crushed ends deck sheets (10:53, 17 December 2020)
- 2.3 - Stud welding (15:26, 29 September 2021)
- 13.8 - Service fixings (14:15, 13 December 2021)
- 9.3 - Offloading, hoisting and storage (12:25, 13 January 2022)
- 8.5 - Extended end laps (13:46, 9 March 2022)
- 7.5 - Aggressive environments (16:45, 24 March 2022)
- 4.6 - Fixings (14:59, 8 April 2022)
- 11.9 Void Protection (13:11, 13 April 2022)
- 11.11 Disposal of Waste (13:51, 13 April 2022)
- 4.1 Construction stage and construction deflections (10:06, 14 April 2022)
- 4.1 - Benefits of composite metal deck (11:25, 14 April 2022)
- 11.2 - Decking around columns (12:42, 14 April 2022)
- 11.7 - Scorching of beams (13:24, 14 April 2022)
- 11.7 Stud Welding causing Scorching to beam (13:41, 14 April 2022)
- 11.3 - Unpainted top flanges (14:38, 14 April 2022)
- 11.5 - Static generator or mains supply (14:55, 14 April 2022)
- 11.6 - Testing (14:56, 14 April 2022)
- 11.8 - Minimising grout loss (15:50, 14 April 2022)
- 6.9 Pre-studded beams (15:07, 19 April 2022)
- 13.7 - Off-site cutting (15:10, 19 April 2022)
- 12.10 - Surface flatness (13:43, 20 April 2022)
- 12.12 - Post-installation characteristics (14:04, 20 April 2022)
- 12.13 Surplus concrete waste (14:08, 20 April 2022)
- 12.1 - Site considerations (15:04, 20 April 2022)
- 9.1 - Delivery and access (15:17, 20 April 2022)
- 6.1 - Shear stud LAW (length after weld) (15:26, 20 April 2022)
- 7.2 - Fixing tool and stud welding gun restrictions (08:12, 21 April 2022)
- 3.2 - Documentation (08:13, 21 April 2022)
- 4.4 - Lateral restraint and diaphragm action (08:13, 21 April 2022)
- 4.8 - Edge trim (08:29, 21 April 2022)
- 12.9 - Surface finish (08:35, 21 April 2022)
- 9.4 - Pack labels / loading-out locations (10:56, 21 April 2022)
- 13.3 - VoidSafe™ Protection System (15:27, 25 April 2022)
- 14.1 - SMD documentation (11:08, 12 July 2022)
- 14.3 - Design standards (11:12, 12 July 2022)
- 14.4 - Further reading (11:12, 12 July 2022)
- 6.6 - Shear stud spacing (09:34, 18 July 2022)
- 8.18 - Forming openings (11:48, 8 August 2022)
- 9.2 - Pack size and sheet length limits (14:01, 9 November 2022)
- 4.7 - Cantilevers (15:25, 9 January 2023)
- 7.4 - Durability (12:57, 20 January 2023)
- 2.2 - Floor deck material specification (12:58, 20 January 2023)
- 2.4 - Roof deck material specification (13:00, 20 January 2023)
- 1.0 - Product certification (12:56, 31 January 2023)
- 9.5 Lifting Shear Studs to Level (14:38, 20 April 2023)
- 5.3 - Fire (13:21, 6 June 2023)
- 13.6 - TAB-Deck™ – Fibre concrete (15:09, 14 June 2023)
- 8.1 - Quality (14:52, 15 August 2023)
- 6.8 - Alternative Shear Connectors (08:55, 29 August 2023)
- 4.9 - Flashings (08:39, 26 September 2023)
- 11.10 VoidSafe® Protection System (13:11, 6 October 2023)
- 12.8 - Placement (08:50, 19 October 2023)
- 4.3 - Temporary propping (08:55, 19 October 2023)
- 0.0 - Introduction to the TGN (08:56, 19 October 2023)
- 5.2 - Saw cuts (08:57, 19 October 2023)
- 12.7 - Concrete mix requirements (08:57, 19 October 2023)
- 14.2 - Industry best practice (09:00, 19 October 2023)
- 6.7 -Transverse reinforcement for composite beams (09:01, 19 October 2023)
- 5.6 - Forming service holes (09:07, 19 October 2023)
- 11.0 - Installation - Floor deck and shear studs (15:07, 1 November 2023)
- 11.6 - Stud welding: Testing (16:00, 1 November 2023)
- 4.2 - Sheet lengths (16:20, 1 November 2023)
- Main Page (12:37, 3 November 2023)
- 4.0 Design, Floor deck (12:46, 3 November 2023)
- 2.0 - Specification (13:08, 3 November 2023)
- Contents (13:55, 3 November 2023)
- 10.1 - Safety nets (15:08, 3 November 2023)
- 5.4 - Moving concentrated loads (15:10, 3 November 2023)
- 4.5 - Bearings / Support (12:34, 25 March 2024)
- 12.6 - Reinforcement drawings and bending schedules (14:53, 17 April 2024)